Kitchen tiling in Molina de Segura
If you also change the sink, the tile is coordinated with the sockets and worktop. First, it specifies where those pieces will remain. Finishing the wall before solving the connections can force you to intervene again on a newly placed finish.
Tell us about your kitchen
Choose the type of renovation and the approximate size. Then write to us or fill out the form.
Prepared walls and resolved joints
- WithdrawalDisassembly of the covering that has been agreed to be replaced.
- SupportChecking the flatness and preparation of the wall.
- StakingLayout of pieces and position of the cuts.
- PlacementTiling walls or dashboard area.
- TogetherChoice of grouting and treatment of joints.
- AuctionsFits around sockets, furniture and worktops.
Kitchen tiling quote in Molina de Segura
What the work should include
The match with the worktop requires knowing the final height and the order of installation, so that the item includes the bottom finish and its preparation.
Is the worktop or splashback installed first if we only cover the sink area?
We order both works according to the materials and the planned finish. The important thing is to measure the final dimensions and avoid leaving a match unresolved.
The dashboard after fixing the sink bowl
Point out on a photograph where the tap, plugs and new worktop will be. With these positions you can study the layout of the tiling around the washing area. The consultation must distinguish the wall preparation from the placement of the covering and collect the joints that will be visible once the kitchen is installed.






